Right now
OEE for the current shift at each site, split into the three things that can cost you output: availability (was it running), performance (how fast) and quality (how many good parts).
Where did the time go?
Downtime for the current shift, by reason. Stops under two minutes are the losses a shift sheet never records, because nobody writes down a 40-second jam. Here they are counted separately.
Leak-test fixtures: early warning
Each fixture is compared with its own recent history and with the other fixtures testing the same pumps. A seal that is going off reads high on one fixture long before any part fails, so the warning arrives while every part still passes. Limit crossings are a late signal; drift is the early one.
Izmir and Nis, same shift
Both plants run the same product family, so their numbers are directly comparable. Shift windows follow each site's own time zone.
Part genealogy
Enter a serial number to see what the part measured at the end of the line, which housing lot it was built from, and which machining tool made that lot — the questions a warranty claim asks, years later.